Answer
1927.9 and 1692.1
Work Step by Step
We have $\mu=1810,\sigma=92$
the middle 80% means 10% below and 10% above which gives
the probability of $P(z1)=0.1$ and $P(z2)=1-0.1=0.9$
Use Table E, we have $z1=-1.281,z2=1.281$
$\frac{X1-1810}{92}=-1.281, X1=1692.1$
$\frac{X2-1810}{92}=1.281, X2=1927.9$
The maximum and minimum sizes of the homes the contractor
should build are 1927.9 and 1692.1