Answer
Yes, the number 0.95 is not possible.
Work Step by Step
As indicated in the figure above, P(E|DW) is the probability of the shaded area.
Since P(E)=0.55, the maximum of P(E|DW) is 0.55.
The number 0.95 given in the question is not possible.